IVL Svenska Miljöinstitutet

ivl.se
Ändra sökning
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
How Does the European Recovery Target for Construction & Demolition Waste Affect Resource Management?
IVL Svenska Miljöinstitutet.
2016 (Engelska)Ingår i: Waste and Biomass Valorization, ISSN 1877-2641, E-ISSN 1877-265X, Vol. 8, s. 1491–1504-Artikel i tidskrift (Refereegranskat) Published
Abstract [en]

The revised EU Waste Framework Directive (WFD) includes a 70 % target for recovery of construction and demolition (C&D) waste. In order to study the potential change in the resource management of the main C&D waste fractions, as a consequence of fulfilling the WFD target, a Nordic project (ENCORT-CDW) has been performed. Waste fractions studied included asphalt, concrete, bricks, track ballast, gypsum-based construction materials and wood. Recovery scenarios were identified and estimations were made regarding expected savings of primary materials, impact on transport, and pollution and emissions. For wood waste, the main differences between re-use, material recycling and energy recovery were evaluated in a carbon footprint screening based on life cycle assessment methodology. The study concluded that the EU recovery target does not ensure a resource efficient and environmentally sustainable waste recovery in its present form since:

•It is very sensitive to how the legal definitions of waste and recovery are interpreted in the Member States. This means that certain construction material cycles might not count in the implementation reports while other, less efficient and environmentally safe, recovery processes of the same material will count.

•It is weight-based and consequently favours large and heavy waste streams. The result is that smaller flows with equal or larger resource efficiency and environmental benefit will be insignificant for reaching the target.

•It does not distinguish between the various recovery processes, meaning that resource efficient and environmentally safe recovery cannot be given priority.

Improved knowledge on C&D waste generation and handling, as well as on content and emissions of dangerous substances, is required to achieve a sustainable recovery.

Ort, förlag, år, upplaga, sidor
2016. Vol. 8, s. 1491–1504-
Nyckelord [sv]
Recovery, Construction & demolition waste, Life cycle assessment, Resource efficiency
Identifikatorer
URN: urn:nbn:se:ivl:diva-3766DOI: 10.1007/s12649-016-9661-7OAI: oai:DiVA.org:ivl-3766DiVA, id: diva2:1572977
Anmärkning
A-rapport, A2230Tillgänglig från: 2021-06-24 Skapad: 2021-06-24

Open Access i DiVA

Fulltext saknas i DiVA

Övriga länkar

Förlagets fulltext

Sök vidare i DiVA

Av författaren/redaktören
Erlandsson, Martin
Av organisationen
IVL Svenska Miljöinstitutet
I samma tidskrift
Waste and Biomass Valorization

Sök vidare utanför DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetricpoäng

doi
urn-nbn
Totalt: 41 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf