IVL Swedish Environmental Research Institute

ivl.se
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Black swans swimming in product streams: method for including unplanned events in life cycle assessment
IVL Swedish Environmental Research Institute.ORCID iD: 0000-0003-3224-0167
Chalmers University of Technology.
Chalmers University of Technology.
2024 (English)In: The International Journal of Life Cycle Assessment, ISSN 0948-3349, E-ISSN 1614-7502Article in journal (Refereed) Published
Abstract [en]

Introduction Unplanned events such as accidents and more massive black-swan events are contingent to modern technology. However, varying approaches and inconsistent guidelines make the inclusion of unplanned events in life cycle assessment (LCA) uncommon and challenging. This paper discusses the relevance of considering unplanned events in LCA and shows how they can be included in LCA practice.Method A theoretical background to the concepts of black swans, accidents, and unplanned events is first provided. We then propose a method for how unplanned events can be included in LCA practice, illustrated through three cases: (i) a sabotage in the energy system, (ii) an accident in the use phase, and (iii) a sudden policy change.

The results show that unplanned events can be included and may significantly affect LCA results, sometimes even fulfilling criteria for black-swan events.Conclusions We suggest that unplanned events should be included in LCA when relevant, e.g. as one scenario in LCAs of product systems sensitive to accidents. We also suggest that changes in flows due to unplanned events should be considered in unit processes, so that their impacts become distributed across downstream product systems depending on demand for the unit-process output.

Place, publisher, year, edition, pages
Göteborg: IVL Svenska Miljöinstitutet, 2024.
National Category
Construction Management
Identifiers
URN: urn:nbn:se:ivl:diva-4398DOI: 10.1007/s11367-024-02344-4Local ID: A2695OAI: oai:DiVA.org:ivl-4398DiVA, id: diva2:1891008
Funder
Vinnova, BASE - Batteries SwedenChalmers University of Technology
Note

A-rapport, A2695.

Available from: 2024-08-21 Created: 2024-08-21 Last updated: 2025-02-14

Open Access in DiVA

No full text in DiVA

Other links

Publisher's full text

Search in DiVA

By author/editor
Hermansson, Frida
By organisation
IVL Swedish Environmental Research Institute
In the same journal
The International Journal of Life Cycle Assessment
Construction Management

Search outside of DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 87 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf